To fill a stump hole, remove most of the wood chips, fill with screened topsoil in layers, tamp each layer and finish slightly above grade. A typical hole takes 2 to 5 cubic feet of soil, and professionals charge about $50 to $200 to backfill.
Still need the stump ground first? Check stump grinding costs near you.
Step 1: Clear the chips
Rake and shovel out most of the grindings.
Step 2: Add soil in layers
Add 3 to 4 inches of topsoil at a time and tamp it firmly.
Step 3: Mound and seed
Finish an inch above the lawn, then seed or sod and water.
Keep reading
-
After grinding What to Do After Stump Grinding What to do after stump grinding: clearing the grindings, filling the hole, regrowing grass, handling roots and stopping sprouts, step by step. -
After grinding What to Do With Stump Grindings What to do with stump grindings: using them as mulch, composting, path material, when to avoid them and what professional chip haul-away costs. -
Cost guide How Deep Does Stump Grinding Go? Stump grinders typically cut 6 to 12 inches below ground. Learn standard grind depths, when to grind deeper, what it costs and what happens to the roots.
Browse all stump guides or go back to the stump grinding costs homepage.
Frequently asked questions
What is the best soil to fill a stump hole?
Screened topsoil, optionally mixed with compost, is best for growing grass.
Can I fill a stump hole with the grindings?
Not on their own. Chips decay and sink and rob nitrogen from grass. Remove most and use topsoil.
How much soil do I need to fill a stump hole?
Most holes need 2 to 5 cubic feet. Measure width and depth to estimate.
How do I stop a stump hole from sinking?
Fill in layers, tamp each one and leave the top slightly mounded. Add more soil after a few weeks.
How much does it cost to have a stump hole filled?
Most companies charge about $50 to $200 to backfill and level a stump hole.
Can I plant grass right after filling the hole?
Yes. Seed or sod right away and keep it moist for two weeks.
Should I add fertilizer when filling the hole?
A little nitrogen fertilizer helps offset any leftover chips. Follow the label rate.
What if the hole is very large after full removal?
Use fill dirt for the bottom and topsoil for the top 6 inches, compacting as you go.
Sources and methodology
Last updated . Prices are estimates built from published contractor rates, national cost guides and federal labor data. Read how we calculate prices.